TECNOTask S.p.A. has performed the Tie-ins activities, the dismantling of the existing lines and the installation of new prefabricated pipe spools as well as the assembly of carbon steel and stainless steel pipe supports.
In parallel, TECNOTask has carried out the activity of work supervision, planning and preparation of Test Packages for the hydraulic tests execution.